For financiers
GPU lenders and lessors underwrite four things: the customer contract, the hardware, the facility and the operator. This page shows how we present each.
What you can check
Facility and site control
Halls we develop and operate, on sites where grid power is already live. Construction is led by EESH and carried out by best-in-class engineering and construction companies.
Site control is documented for at least the financing term, and each site's datasheet states its redundancy, cooling and certification status as built.
Lien waiver and step-in rights
Financed hardware sits in a project company. The hosting agreement waives the facility's claims on the hardware and gives the lender the right to step in and keep it running.
Insurance
Property insurance on the hardware from delivery, with the lender named as loss payee.
Asset register and reporting
Every server is registered by serial number at delivery. Monthly reports cover uptime, utilisation, energy and payments received.
Offtake and operating record
We buy GPUs against signed customer contracts and disclose them to the lender in full: term, price, prepayment and committed share.
Our record: more than 20 MW of data-centre capacity developed, NVIDIA H200 GPUs in production in Budapest, and 1.6 MW of AI capacity due in Q2 2027.
How a financed deployment is structured
- Offtaker and project companyA capacity contract with term, price, prepayment and committed share.
- Lender and project companyA loan secured on the hardware, the contracts and the accounts.
- Data hall and project companyA hosting agreement with a lien waiver and lender step-in rights.
- EESH and project companyEESH develops the hall, operates the hardware and reports every month.
Projects
Capacity by status. The projects in development and the sites in the pipeline have live grid power.
| Project | Status | Capacity | Scope | Ready for service |
|---|---|---|---|---|
| Earlier developments | Delivered | 20 MW+ | Data-centre developments completed to date | Completed |
| GPUs in production | NVIDIA H200 | AI workloads running on our own systems in Budapest | Running | |
| AI projects I and II | In developmentLive grid power | 1.6 MW | Data-centre build-out led by EESH, equipped with NVIDIA B300 systems | Q2 2027 |
| Development pipeline | PipelineLive grid power | 100 MW+ | Sites in the United States and Central Europe | By project |
Locations, single-line diagrams and dated datasheets for each project are part of the diligence pack.
Ask for the diligence pack
Company documents, project summaries, site datasheets and draft contract terms, shared under NDA.