Built for density
One reference design, adapted to each site: live grid power with generator backup, redundant power to the rack, and air and liquid cooling in the same hall.
Reference design
Follow the power from the grid to the rack, then the heat back out. Select a stop to see it on the drawing. These are design targets; each site's datasheet states what is built.
Projects
Capacity by status. The projects in development and the sites in the pipeline have live grid power.
| Project | Status | Capacity | Scope | Ready for service |
|---|---|---|---|---|
| Earlier developments | Delivered | 20 MW+ | Data-centre developments completed to date | Completed |
| GPUs in production | NVIDIA H200 | AI workloads running on our own systems in Budapest | Running | |
| AI projects I and II | In developmentLive grid power | 1.6 MW | Data-centre build-out led by EESH, equipped with NVIDIA B300 systems | Q2 2027 |
| Development pipeline | PipelineLive grid power | 100 MW+ | Sites in the United States and Central Europe | By project |
Locations, single-line diagrams and dated datasheets for each project are part of the diligence pack.
How we build
Power first
We develop sites where grid power is already live. That holds for the projects in development and for every site in the pipeline.
Redundant to the rack
Two independent power paths reach every rack position, backed by UPS and standby generators. Maintenance on one side does not take the load down.
Hybrid from day one
Hardware generations change faster than buildings. Our halls carry air-cooled and liquid-cooled rows on the same plant, and a row can change from one to the other.
What a site datasheet covers
Each site has a dated datasheet with the fields operators, lenders and offtakers ask for. It is part of the diligence pack.
Power
- Grid connection: capacity and status
- IT load today and at full build
- Power path and redundancy
- Backup power and autonomy
- Supply terms and price basis
Cooling and density
- Sustained kW per rack
- Air and liquid capacity
- Design and measured PUE
- Heat rejection and reuse
Space and network
- Floor loading and rack positions
- Delivery route and staging
- Carriers and route diversity
- Own IP space and BGP
Resilience and control
- Maintenance concept
- Incident history
- Site control and term
- Certification status
Ask for the diligence pack
Company documents, project summaries, site datasheets and draft contract terms, shared under NDA.