For offtakers

Dedicated GPU capacity in halls we develop and operate, on live grid power, with a date you can plan around.

What you can check

What is deployable, and when

1.6 MW across two projects on live grid power, equipped with NVIDIA B300 systems, scheduled for service in Q2 2027. Further capacity follows from a pipeline of more than 100 MW, on sites where the power is already connected.

Compute, network and storage

NVIDIA B300 systems. Network, storage and the software stack are specified with you before the hardware is ordered, and written into the contract.

Service levels and support

Availability, response times and service credits are set out in the contract. Ask for the draft terms with the diligence pack.

Jurisdiction, security and data protection

EESH is an EU company under Hungarian law. Capacity in our Central European halls stays under EU data-protection rules, and we sign a data-processing agreement where personal data is involved.

Contract models

Reserved capacity on dedicated hardware for a fixed term, or hosting for hardware you own. Both come with a contracted ready-for-service date.

From enquiry to capacity

  1. Requirement

    GPU type and count, start date, term.

  2. Offer

    Capacity, price basis and draft terms, with the datasheet of the hall.

  3. Contract

    Capacity agreement signed. Hardware is ordered against it.

  4. Hand-over

    Acceptance tests at your load, then access.